Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

Why did the Byzantine military grow weaker?
What term references a period of economic growth as measured by a rise in the real GDP? A. trough B. recession C. expansion D. depression
What lever has resistance between the axis (fulcrum) and the force (effort)?
If one body is positively charged and another body is negatively charged, free electrons tend to A. remain in the positively charged body. B. move from the nega
what is the LCD for the fractions 5/6 and 3/8 PLZ HURRY a. 14 b. 18 c. 24 d. 48
birds use their beaks to rub their feathers with oil secreted by the?
is it possible for Transnet to make economic loss in the short-run? Briefly motivate with the aid of a graph
Whats another name for a non vascular plant?
Fran drew a triangle with no congruent sides and one right angle which term accurately describes a triangle mark all that apply it is not a test but it just say
What is the function of meiosis?