brimccauley6658 brimccauley6658
  • 03-08-2022
  • Business
contestada

In a project network, the critical path is the sequence of activities which has the:________.

Respuesta :

66hello60
66hello60 66hello60
  • 03-08-2022

Answer:

The correct answer is the longest time

Answer Link

Otras preguntas

a number increased by nine is translated as
how many branches of government did the roman republic have?
what is2.3684 roundes to the neareat thousandth
A restaurant offers a dinner special that has 12 choices for entrees, 10 choices for side dishes, and 6 choices for dessert. How many different meals are possib
what is the electrical charge of a cation? a. positive b. negative c. no charge d. none of the above
Is it possible to still become a pro soccer player when you are 13
an indoor water park has two giant buckets that slowly fill with 1000 gallons of water before dumping it on the people below. one bucket dumps water every 16 mi
social darwinism was used to justify all of the following except a. the existence of poverty. c. the power of millionaire industrialists. b. the success of big
The Embargo Jefferson declared against Britain in 1807 A) disrupted the British economy and closed British factorit's B) caused a substantial increase in profi
what is - x when x is = to 12