hopsonjackie5492 hopsonjackie5492
  • 03-11-2021
  • Business
contestada

when preparing a flexible budget, variable costs are expressed as a constant amount _____, and fixed costs are expressed as a constant amount _____.

Respuesta :

kyliealexisortiz kyliealexisortiz
  • 10-11-2021

Answer: per unit; in total

Explanation:

Answer Link

Otras preguntas

Invisible damage to the body resulting from repeating a movement often is a _______________.
What is the proximity and availability of food, water, and shelter to each other called?
How did women use their position in the work face to demand rights ? Check all that apply
What is personification as an English term?
In which situation is mechanical energy converted to electrical energy? A) boiling water B) using an iron C) the sun shining D) using a generator
Which two themes of Ibsen's A Doll's House are reflected in this excerpt from act 1 of the play? HELMER: Don't disturb me. (A little later, he opens the door an
Which feature of menu option of word processing program can you make images
Why does hot water freeze faster than cold water?
What is the value of x 0.4x + 3.9 = 5.78
factors affect the choice of location of a city