krishnashrrstha41
krishnashrrstha41 krishnashrrstha41
  • 04-08-2021
  • Mathematics
contestada

15men can complete a piece of work in25days. how many men should be added to complete the same work in15days.​

Respuesta :

mhanifa
mhanifa mhanifa
  • 04-08-2021

Answer:

  • 10 men

Step-by-step explanation:

Amount of work done by 15 men is:

  • 15 men *25 day = 15*25 man*days

Same work can be done by 25 men, in 15 days, so 10 more men should be added.

Answer Link
abovejosh
abovejosh abovejosh
  • 04-08-2021
Answer: 10 men explanation: guy above me
Answer Link

Otras preguntas

i need help 7th grade 13 + p + - 4 3
4. Which types of foods contain which types of macromolecules? Is one type of macromolecule healthier to eat than another? Why do you think so?
compare 9x10^4 and 3x10^2
Help me guys please
What is 8.038 x 10 to the 8th power in standard form
Why are most modern constellations composed of faint stars or located in the southern hemisphere?
Is applied to roads in wintertime so that the ice will melt at a lower temperature?
What should be your response as you approach a roundabout? a. speed up. b. choose the correct lane. c. don't stop for traffic already in the roundabout as you h
if 2/3 of the girls in class have brown eyes and 1/4 of the girls have blue eyes, what fraction of the girls in class have neither blue or brown eyes? need help
What are some of the techniques by which mixtures can be resolved into their components?