It take 4 people 40 minutes to clean a garden. How long will it take 6 people to clean the same garden

Respuesta :

loconte loconte
  • 02-07-2021

Answer:

4/9 of an hour (26.666 minutes)

Step-by-step explanation:

4 * x * 40/60 = 1

x * 160/60 = 1

x=60/160 = 6/16 = 3/8 (this is the rate for one worker)

~~~~~~~~~~~~~~~~

6 * (3/8) * x = 1

x = 4/9

Answer Link

Otras preguntas

Read and choose the correct option to complete the sentence. Pepa estaba nadando en con sus hermanos. el bosque el río el terremoto el humo
Please help? will give brainlist
Name and find the measure of each angle in the figure. HELP PLEASE
3) Imagine—we have two candidates with real credentials Type of sentence:​
Write the equation of a line that is parallel to the given line and passes through the given point. y=1/3x+1 (-3,4)
7 How can this product be simplified? 5x²(2x - 3)
The mass ratio of H to O in water (H2O) is 1:8. What is the mass ratio of H to O in hydrogen peroxide (H2O2)?
For the reaction 1Pb(NO3)2 + 2KI −−> 1PbI2 + 2KNO3, how many moles of lead iodide (PbI2) are produced from 300.00 g of potassium iodide (KI)?
The average of 25,29, and x is 29. Find x
given the qintic equation below, solve it to find the values of x. 2x^5_6x^3_4x^2_2x+4 =0​