shresthasamrachana06
shresthasamrachana06 shresthasamrachana06
  • 01-04-2021
  • Mathematics
contestada

12 workers can do a peice of work in 20 days. How many workers should be added to complete work in 16 days?​

Respuesta :

atchleyamirah69
atchleyamirah69 atchleyamirah69
  • 01-04-2021
3 workers

if 12 workers can do a piece of work in 20 days, then one person can do it in 240 days. 240/16 is 15. That is the number of workers that you need in total to it in 16 days. Since the question ask how many more workers,
15 - 12 = 3 more workers.
Answer Link

Otras preguntas

What is 100,203 in expanded form
Is 2 thousandths + 4 hundredths is greater or less than 0.127
What is 11/9 reduced to a mixed number?? i cant figure this out
How do you write 4.293 in expanded form?
how many ten thousands equal 400,000
If one paper clip has the mass of 1 gram and 1,000 paper clip have a mass of 1 kilogram, how many kilogram are 8,000 paper clip
If one-half of a number is 8 less than two-thirds of the number, what is the number?how? 1)24 2)32 3)48 4)54
rebeldes de tejas in english
Solve V= lwh for w.Please help.
A farmer builds a fence to enclose a rectangular pasture.He uses 160 feet of fence. Find the total area if the pasture is 50 feet long