It takes 2 workers 6 days to paint a mansion. How many days would it take 4
workers to do the same job?

Respuesta :

dontmindme3
dontmindme3 dontmindme3
  • 01-03-2021

Answer:

2 workers = 6 days

4 workers = 3 days

Step-by-step explanation:

If it takes 2 workers 6 days, if you seep up the process with 4 workers, you would divide the days by 2 because you multilpied the workers by 2. So, it would take 3 days with 4 workers. I hope that makes sence.

Answer Link

Otras preguntas

the perimeter of a square is 4 times as great as the length of any of its sides. Determine whether the perimeter of the square is proportional to the side lengt
What's another name for vital signs?
water in a pan over a radiator evaporates much faster than a water pan in a table ???? i need help ppl
Can someone help me in probability?Amanda wrote a computer program that generates two random numbers between one and eleven.When she runs it,what is the probabi
List the perfect squares between 100 and 500 that are even numbers.
what is 20% of $45.00?
The discovery of gold in Transvaal contributed to the start of _____?the Anglo-Boer WarWorld War IIWorld War Ithe Peloponnesian War
HOW TO FIND THE MISSING NUMERATOR IN ANY FRACTIONS LIKE 4/8=  ?/4
What is the meaning of Pangaea
What's another name for vital signs?