ishamahmood22 ishamahmood22
  • 04-02-2021
  • Mathematics
contestada

if it takes 4 workers 6 hours to paint a fence, how long would it take 8 workers

Respuesta :

tristonanderson38
tristonanderson38 tristonanderson38
  • 04-02-2021

Answer:

3 workers

Step-by-step explanation:

just divide by 2

Answer Link
snuddy0809
snuddy0809 snuddy0809
  • 04-02-2021
It would take 8 workers 3 hours
Answer Link

Otras preguntas

Please help thank you much!
A 15 ft ladder makes a 52° angle with the ground. How far will the top of the ladder be above the ground.
The radius of a right circular cylinder is increasing at the rate of 6 in./s, while the height is decreasing at the rateof 3 in./s. At what rate is the volume o
The probability that you randomly select a red marble from a group of 40 marbles is 7/20 How many are red marbles? (Type in only the integer)
Which of the following systems rewards an employee based on the length of service the employee has had with the​ organization?
Please Help!! 35 Points!!! Which of the following is NOT a focus of Realism? plants and animals issues relating to class corruption real life
Someone help PLEASE
write a polynomial of least degree with rational coefficients and with the root -19-5 square root 2. Write your answer using variable x and in standard form wit
ANSWER ASAP I NEED TO GRADUATE THIS WEEKthe coordinates (4, -1). What17. A line has a point with the coordinates (-3,-2) and a point with the coordis the slope
What is f(3)? f(x)=(3x^2 +9)/x+1