medm0om5iebernan medm0om5iebernan
  • 01-11-2016
  • Mathematics
contestada

A construction company delivered 40 loads of concrete in 5 days.

What was their rate of work?



A.




B.




C.




D.


Respuesta :

melhunt99
melhunt99 melhunt99
  • 05-11-2016
Well 40 divided by 5 is 8 and you don't have options so I would say 8 loads a day :)
Answer Link

Otras preguntas

What is the vertex of y=2x^2
What is the value of h in the diagram below? If necessary, round your answer to the nearest tenth of a unit.
Sometimes you to ___ some points to get a good approximation of the location of extreme values
If you dissected a tadpole, what difference would you find from what you saw in the adult frog?
Enzymes are proteins that speed up chemical reactions in the body. How do they work?
I need help with this question please
What are the two ways cross pollination can occur?
on. If your car gets 30 miles per gallon, find the coSuppose gasoline costs $1.15 per gall,Gasoline for a 900-mile trip.Answer:a. $345.00b. $35.40c. $34.50cd. $
When one area of the world is economically affected by a natural disaster in another country, what is this called?
Which polynomial function has a leading coefficent of 3 and roots -4,i, and 2 wit multiplicity 1