toniaotieno
toniaotieno toniaotieno
  • 02-01-2021
  • Mathematics
contestada

how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

What is the slope-intercept equation of the line with a slope of and a y-intercept of 3?
Simply the expression -2.2f+0.9f-14-8
Which of the following is a yield from a tree? Roots Timber Branches Vegetables
Which ethnic groups became a part of the United States by annexation? A. Mexicans and native Hawaiians B. Africans and Europeans C. Chinese D. All of the above
تعليمات هو واحد زائد واحد؟
If the “Final Solution” was to murder all Jews, why do you think the Nazi’s set up concentration camps in addition to death camps?
Help me please which one is it
please answer this ASAP x-6/9=-5
Question 1 What is 18% as a decimal? Question 2 What is 7/8 as a percentage?
Find SY and XY. PLEASE HELP ME IT IS DUE SOON IF YOU DONT KNOW DO NOT ANSWER