The transition from ____ is initiated by the Job Scheduler according to some predefined policy. At this point, the availability of enough main memory and any requested devices is checked.

Respuesta :

isaacoranseola
isaacoranseola isaacoranseola
  • 04-03-2020

Answer: Hold to ready

Explanation:

This is when the process is waiting to be assigned to a processor. And this is carried out by the short term scheduler, so it can run. This state is immediately after the new state for the process.

Answer Link

Otras preguntas

I need help with this math suff, its um Solving Inequalities, yeah :|
Ragini wants to lay tiles of size 20 cm x 20 cm on the floor of her kitchen which is 8 m in length and 4 m in breadth. How many tiles are required to complete
Write a rule for the translation of ALMN to AL'M'N'. L' -4 4 M' -2 -2 y N L (x, y) → (¯¯) ([ M 6 x N
Mapoela walks 2km in 30minutes.at that rate how far coul she walk in 1hour 30minutes
how to draw a profile figure​
The diagram shows a right angle triangle 9cm 23 degrees what is the value of h
what is the answer for 2 divided by 78
What is a central idea of the passage? Δ B The United States must focus on the defense of human rights and the promotion of freedom worldwide. C The world is de
Si el conductor de un automóvil desea aumentar su rapidez de 39mi/h a 81mi/h mientras corre una distancia de 941ft ¿Cuál es la aceleración constante que debe ma
If a = b, then b = a.