Estimate the quantity of soil to be excavated from the borrow pit​

Respuesta :

lola2487
lola2487 lola2487
  • 04-08-2019

Answer

1056

Explanation:

for example

A soil is to be excavated from a borrow pit which has a density of 1.75g/cc and water content of 12%. The G is 2.7 the soil is compacted to that water content of 18% and dry density of 1.65g/cc. for 1000 m3 of soil used in fill estimate

Quantity of soil to be excavated from pit in m3

Answer Link

Otras preguntas

Industrial work in the factory resulted in ________ compared to work as a skilled artisan. a. an overall lower productivity b. lower product quality c. higher s
What is a primary function of the body covering of terrestrial animals?
in a chemical reaction, mass is conserved. this means that...
Southeast asia, compared to the south asia realm, is:
How did prospero and miranda end up on the island years before the present action of the play?
What is the primary source of fuel for the brain? a. proteins b. fats c. carbohydrates d. vitamins?
What is 8+24÷(2×6_4 what is the strategy I used and what's the answer
A large sphere is used for the base of the snow man what is the height of the large sphere
Southeast asia, compared to the south asia realm, is:
About what percent of whites owned slaves or belonged to a family who owned slaves