JaymezMerfy1002 JaymezMerfy1002
  • 01-10-2018
  • Computers and Technology
contestada

Which term describes the complexity of a document

Respuesta :

narstarolor
narstarolor narstarolor
  • 06-11-2020

Answer:

Work breakdown structure (WbS)

Explanation:

A work-breakdown structure in project management and systems engineering, is a deliverable-oriented breakdown of a project into smaller components. A work breakdown structure is a key project deliverable that organizes the team's work into manageable sections, and also defines its complexity.

Please let me know if this helped

Answer Link

Otras preguntas

Which of the following conclusions can be accurately drawn by analyzing both the Silk Road trade and the African gold-salt trade?
Which culture is correctly matched with the form of writing it used?
How do you solve 4x^2-12x=7 algebraically
n the classical world, historians often described past events as caused by fate, gods, or other supernatural factors. Today, historians study the same events as
List the sides in order from shortest to longest. The diagram is not to scale.
The system of equations is coincident. What are the missing values? x+3y=5 4x+_y=_ Need help PLZZZZ!!!!!!!!! :) :)
Need help with graphing proportions!
Which of these helps you understand what people are saying to you? A. Thinking about how you'll respond B. Looking away while they're speaking C. Thinking about
the sum of a product (-2)+(-2)+(-2)+(-2)
How do you start your car with an EIF system